Description   Qty Rate Total
PRIMARY
Kyocera KC-120 120 watt panel 8  $      599.00  $   4,792.00
UniRac UGR-104 ADJ Holds 4 panels 2  $      265.00  $      530.00
Trace C-60 Charge Controller 1  $      199.00  $      199.00
Trace DC250 disconnect 1  $      329.00  $      329.00
Trojan T-105 battery 6 volts each 16  $        63.50  $   1,016.00
#2 x 12" 12  $         5.00  $        60.00
#2 x 18" 6  $         7.50  $        45.00
4/0 x 10' inverter cable 2  $        75.00  $      150.00
4000W, 24V true sinewave inverter with 120A charger 1  $   3,495.00  $   3,495.00
AC lightning Arrestor 1  $        18.50  $        18.50
DC Lightning Arrestor 1  $        32.50  $        32.50
8' copper rod, #4 bare wire (5'), acorn 1  $        16.98  $        16.98
12/2 SJ Cord 20  $         0.50  $        10.00
  Total Primary Materials  $    10,693.98
ANCILLARY
Concrete 1  $      130.00  $      130.00
Poles (2x6) 12  $        13.87  $      166.44
 $        296.44
Total Material  $    10,990.42
LABOR Estimate
(Estimated to be from 15% to 20% of material cost.) Hours Rate Total
Initial Analysis 1  $        40.00  $        40.00
   (survey of particular site, 25 miles from Installation Center no charge, over 25 miles plus mileage charge.)
Concrete- Pole Installation 10  $        40.00  $      400.00
aComponent Installation 1st day (outside & inside) 10  $        40.00  $      400.00
Component Installation 2nd day (outside & inside) 10  $        40.00  $      400.00
Follow-Up (tie-up loose ends, walk through) 4  $        40.00  $      160.00
 $     1,400.00
Total Material & Labor  $    12,390.42